Everyday, I knit a bit on each of these projects.
The curtain gets a minimum of two rows per day, 200 stitches per row. I estimate I am about halfway done, plus 10% for shrinkage, plus curtain rod sleeve.
When I started the shawl, I knit ten rows a day. Now that there are 295 stitches on the needles, it too gets knit at least two rows a day. (The next row is an increase row, then it will be 319 stitches.)
The curtain requires a lot of counting, not so much the shawl, except for the increase rows. Some days I am tempted to work on something short and sweet, but we all know where that path leads - more UFOs.
No comments:
Post a Comment